KH Engineering Ltd
Allenwood,
Naas,
Co. Kildare,
Ireland
E: info@khengineering.ie
T: (045) 860722
F: (045) 860671
site by: OGX Digital
The first steel package in the National Children’s Hospital. The project weighing 145 Tonne which was Fabricated and Installed to Execution class 4 certification standards. The project made up of mainly beam and column with some sections weighing up to 900 kg/mt and single plate girders when fabricated weighing up to 28 Tonnes which will support part of the lower levels of the hospital structure above. Various plate connections required up to 65mm fillet welds.